Home Press resources News 2017 TIGF is reconstructing the Bassac stream

Print

TIGF is reconstructing the Bassac stream

Pau, to October 17, 2017

TIGF is committed to being environmentally friendly. With its Be Positive programme, TIGF is reconstructing the Bassac stream Work on the gas pipeline on the Bassac stream, in France's Haute-Garonne department, is currently under way. This work will help secure the gas pipeline, as well as protect the environment by preventing the natural erosion of the stream.
As

As part of its business of transporting and storing natural gas, TIGF incorporates environmental aspects into its projects.

These environmental practices cover all areas that might be affected by TIGF's activities (air, water, biodiversity, soil, landscapes, underground). TIGF is currently replacing a gas pipeline section 44 m long and 250 mm in diameter along the bed of the Bassac stream in France's Haute-Garonne department.

EN Standard TEREGA : 0 559 133 400EN Urgence Gaz : 0 800 028 800

ENERGY IS OUR FUTURE, LET'S NOT WASTE IT!Copyright ©2018 TEREGA. SitemapGlossaryLegal noticeCredits